米乐m6手机网页

Provides products and services covering the entire life cycle of buildings.

01
04
bg-bg-left

We use TAS, TRB, TBQ for this project. It takes about 1 month.Our feelings are as follows:1. We build the TRB model first, then import to TAS; import BQ into TBQ, connect TAS & TRB with TBQ, link the quantity of the corresponding entity with the BQ item, and compare the contract BQ with the actual quantity quickly. Save us lots of time!2.The structural drawings of this project use China's flat construction drawings, and the efficiency of TRB modeling is still high. The intuitive rebar 3D make us to check easily.

Edwin Chen/Tan mi/Xuling

米乐m6手机网页

Quantity Surveyor Giant Leap Construction

米乐m6手机网页

All Events
PAQS Congress 2023

米乐m6手机网页

Sep 22.2023 - Sep 26.2023 ? 00:00 - 00:00 ? GMT + 8
Offline
To AI or not to AI: New workflows and roles for reducing carbon in built assets

米乐m6手机网页

Sep 06.2023 17:00-18:00 ? GMT + 8
Online
Meet Glodon at Digital Construction Week, Unlocking the Potential of Digital Construction

米乐m6手机网页

May 17.2023 - May 18.2023 ? 17:00 - 18:00 ? GMT + 8
Offline
米乐m6手机网页 jl sh hl sc sc fj ha sn jp sn | 下一页 sitemap